Projects

Kadena

Controlled Humidity Warehouse at Kadena Air Base

The Alliance Team constructed a controlled humidity warehouse to support a scalable operation to deliver Joint Class VIIIA medical logistics support at Kadena Air Base. Primary facilities included: a warehouse with a 4-bay loading dock, administrative area, operations area, and storage section. Other supporting facilities include: a energy monitoring and control systems (EMCS), intrusion detection system […]

DHA Seal.png

National Intrepid Center of Excellence (NiCOE) Site Prep Studies

The Alliance Team provided master planning services for four National Intrepid Center of Excellence (NiCOE) sites CONUS for the DHA: Joint Base Lewis-McChord, Fort Carson, Fort Bliss, and Camp Pendleton. Services included on-site planning charrettes, stakeholder interviews, DD Form 1391 development, and geotechnical analyses. The geotechnical analyses were required to determine soil quality and bearing capacity […]

CDC BCA

Child Development Center Business Case Analysis

Alliance prepared a business case analysis for a child development center on or near the Washington Navy Yard. The Alliance Team developed a structured methodology that examined the financial implications, timeline for development, achievable capacity, and overall site suitability for a child development center. The report included life cycle cost analyses, concept drawings and renderings, […]

Naval Observatory

Naval Observatory Master Clock Facility

The Alliance Team developed a DD Form 1391 for the construction of a new Master Clock Facility, along with the renovation of four facilities and upgrades to supporting infrastructure and equipment, at the Naval Observatory Center in Washington, D.C. The Naval Observatory provides astronomical data, products, and serves as the official source of time for […]

Marine Barracks

Marine Barracks Communications Hub

Alliance supported the relocation and renovation of the Communications Hub at Marine Barracks Washington. The Alliance Team performed a risk analysis utilizing CrystalBall, detailing the risk for cost overrun, an increase in labor for overtime, and additional time on-site for the infrastructure modification, interior alterations to include architectural, electrical, telecommunication, mechanical and fire protection systems […]

scott-air-force-base-monument-62225

Scott Air Force Base Value Engineering Study

The Alliance Team conducted a value engineering study and detailed cost estimate for two facilities at Scott Air Force Base. A value engineering study was conducted for the base medical clinic and included a Logistics Renovation and Infrastructure Repair cost estimate. The second project included the renovation and expansion of the Veterinary Treatment Facility.

BUILDER Logo

BUILDER™ SMS Implementation

Alliance, in partnership with CALIBRE Systems, performed condition survey inspections for building-related component infrastructure using the BUILDER™ Engineered Management System (EMS) for U.S. Defense Health Agency (DHA) facilities worldwide. The Alliance Team surveyed over 11 million square feet of facilities and provided assessments necessary for routine building facility management activities including long-range budgeting and sustainment […]

NAVFAC Museum B67 Navy Yard 160310

Historic Resource Facilities Renovation

The Alliance Team developed a Facility Engineering Assessment Design Study and DD Form 1391 for the renovation of three buildings at the Washington Navy Yard. The project required extensive programming, facility cost estimating, economic analyses, and architecture and engineering design support data to renovate unique and historic buildings with various architectural, historic, fire protection/life safety, […]

PAX River

Building 8165 Addition

The Alliance Team developed a budget cost estimate for an addition to the Building 8165 at Webster Field Naval Air Station. The team conducted a site survey and market research to develop the cost estimate in accordance with UFC and AT/FP requirements.

Groton

Tier 1A Micro-Grid

Alliance supported the design of the micro-grid project at Naval Submarine Base New London. The project added new equipment to the existing switching and substation infrastructure, monitoring and automation capabilities, and a Supervisory Control and Data Acquisition (SCADA) system. The SCADA system monitors and controls the micro-grid with minimal physical operator involvement, and was designed to comply […]

BUMED Seal

Facility Condition Assessments Worldwide

The Alliance Team performed healthcare facility condition assessments for over 18.2 million square feet at 614 medical facilities at 52 CONUS and 11 OCONUS locations on behalf of the Department of Navy, Bureau of Medicine and Survey (BUMED). The projects included facility condition evaluations, functionality assessments, and Defense Medical Logistics Standard Support (DMLSS) data validations. Our […]